KHONKAEN SUGAR INDUSTRY (2014)
• Upgrading Bagasse Firing Boiler 80 T/H To be 110 T/H, 22 Kg/Cm2(G) 360 °C
• Modification of Economizer System for Bagasse Firing Boiler 200 T/H 22 Kg/Cm2 (G) 360 °C Completed with Electrostatic Precipitator (ESP) for Boiler 200 T/H
Project Status
Completed